Regulation (EU) 2025/40Applies from 12 Aug 2026Independent publication - not legal advice
PackagingCompliance.help
The Packing Line - a working desk for the EU packaging regulation
Home / Station 14 - Restrictions and banned formats / Guide

Necessity and Exemptions Within Annex V: The Evidence Standard

Several listings carry qualifications - hygiene, protection, perishability. Holding one is an evidence position: what must be shown, to whom, and the review rhythm that keeps the position honest as alternatives improve.

Published 24 October 2026Checked against the regulation text on 24 October 2026European Union

The short answer

Where Annex V qualifies a listing - necessity for hygiene, for protection, for the perishability of specific produce, the loose-food function of a roll bag - the qualification is a position to be evidenced, not a status to be assumed. The evidence pattern is the one this guide series applies everywhere: the specific product lines covered (never the whole business by association), the factual basis (trial data comparing the alternatives, the hygiene analysis, the waste figures), the provision relied on, and the review date on which the position is re-examined against the alternatives' progress.

This guide sets the standard per qualification family and warns against the pattern that will generate the enforcement cases: necessity as a department-level custom rather than a line-level demonstration.

The qualification families and their proofs

Produce necessity proves with waste and damage data: the line trialled in the alternatives, the loss rates measured, the conclusion drawn per line - the produce guide's file. Hygiene necessity (portions, bags, service contexts) proves with the hygiene analysis: the risk the barrier controls, why the service-model alternatives cannot control it in this setting, and the setting's specifics that make the case (a hospital's catering is not a café's). Handling necessity for grouped film proves with the chain's facts: the distribution function, the removal point, the absence of a sales purpose. Each proof is short, factual and current; each fails in the same way when it is generic, ancient or borrowed from another line's file.

The review rhythm: necessity expires

Necessity is a claim about the present state of alternatives, and alternatives move - the fibre punnet improves, the dispenser cheapens, the paper gains wet strength. Positions should therefore carry reviews keyed to the market (a defined cycle, plus event triggers: a credible alternative launching in the category, a competitor converting the same line you claim is impossible). The review's output is recorded either way: maintained, with the new comparison noted; or conceded, with the conversion planned. A necessity position renewed without a fresh comparison is, on its face, a position about the year it was written - and enforcement in 2032 will read it in the year it is read.

Posture: claim narrowly, convert visibly

The strategic posture the evidence supports: claim qualifications narrowly (the lines that genuinely need them), convert the rest visibly and early, and let the narrowness of the claim be the credibility of the claims that remain. Businesses that defend everything defend nothing - an authority reading a portfolio where every line is necessary learns to discount the word itself, including where it is true. The narrow claim, by contrast, arrives with the portfolio's conversions as its character witnesses. In a regime built on files, credibility is a portfolio asset, and Annex V is where it is most cheaply earned and most expensively lost.

The file that argues by existing

The strongest necessity file is the one assembled before it is needed, as part of the category's ordinary documentation, rather than commissioned when an inspector writes. That timing is visible in the file's dates, and it changes the reading entirely: a position documented in the course of business is a position; the same words assembled after the question are an argument. Build the necessity files in the exit programme's inventory movement, refresh them on their review dates, and let their ordinariness be their eloquence.

A necessity claim that holds, and one that does not

Two produce claims, side by side. The soft-berry line: trials in fibre punnets across two seasons, damage and waste up 6 points, shelf life down a day at retail, the plastic format's necessity recorded for the berry category with the data attached and a review set against a named fibre improvement in trial. The claim holds - specific, measured, current, narrow. The herb and salad department's blanket claim, by contrast, recites perishability in general, attaches a supplier's letter from three years ago, and covers lines already sold loose by the same retailer in another region. It does not hold, and its presence in the same portfolio discounts the berry file it sits beside. Necessity is audited comparatively; write every claim as if the weakest one will be read first, because it will.

Primary sources on the record

Legal status: Annex V to Regulation (EU) 2025/40 (qualifications within the listings). Application position for this topic: Qualifications apply with the listings from 1 January 2030.

Follow the line

Station 14 - Restrictions and banned formats Banned From 2030: The Annex V Format Restrictions Explained Six format families lose their place on the market on 1 January 2030: multipack shrink film, produce plastic under 1.5 kg, dine-in HORECA plastic, single-dose portions, hotel minis and very lightweight bags. The pillar guide to Article 25 and Annex V. Station 14 - Restrictions and banned formats Fresh Produce Plastic Under 1.5 kg: The Listing and Its Necessity Qualifications Plastic packaging for unprocessed fresh fruit and vegetables under 1.5 kg is restricted - with qualifications where need is demonstrated for hygiene, protection or perishability. The scope, the evidence, and the paper, net and bulk alternatives. Station 14 - Restrictions and banned formats Planning the Format Exit: The Portfolio Programme Behind the List Inventory, decide, sequence, run out: the programme that converts Annex V from a legal list into a managed transition - tooling windows, customer conversions, stock discipline and the 2029 readiness audit.